Lab 16: Forward/Reverse with Anti-Plugging Delay

 

Application Scenario

At a quarry, a heavy reversible shuttle conveyor sends crushed rock either to the left stockpile (FORWARD) or to the right stockpile (REVERSE). The belt and its load are very heavy: after STOP, the belt keeps coasting for several seconds.

In Lab 06, the operator had to press STOP before reversing, but could press the opposite START button immediately after STOP. On this conveyor, that would reverse the motor while the belt is still moving forward. Reversing a spinning motor is called plugging. It draws a current even higher than a normal start, heats the motor, and gives the gearbox, couplings, and belt splices a violent shock.

The fix is an anti-plugging delay (also called a coast-down lockout): after the motor stops, no start is allowed until the motor has been stopped for a set time. The same delay also blocks starts for a few seconds after power is restored, in case the belt was still coasting when the power came back.

In this lab (5 seconds represents the coast-down time):

DeviceRole
PB1 (N.O.) FORWARD start
PB3 (N.O.) REVERSE start
PB2 (N.C.) STOP
CR1 FORWARD contactor — G1 lamp in parallel
CR2 REVERSE contactor — R1 lamp in parallel
TR1 (on-delay, 5 s) Stopped-time timer: its contacts close only after the motor has been stopped for 5 s

Learning Outcomes

After this lab you will be able to:

  • Detect "motor stopped" by putting N.C. contacts of both direction contactors in series.
  • Use an on-delay timer as a start permissive that requires a condition to be true for a set time.
  • Place a permissive before the seal-in junction, and an interlock where it can also stop a running motor.
  • Make one relay contact do two jobs by choosing where it sits in the rung.

Background

"Stopped for 5 seconds." The motor is stopped when CR1 is OFF and CR2 is OFF. That is two N.C. contacts in series (AND logic). Feeding an on-delay timer through them gives a contact that closes only when the motor has been stopped for the whole set time. If either direction starts, the timer resets at once.

The timer contact is a start permissive. TR1A is placed in series with the FORWARD START button, and TR1B in series with the REVERSE START button. As soon as a direction starts, TR1 resets and its contacts open, so the seal-in must bypass them (remember Lab 04's design question and Lab 07's start permissive).

One contact, two jobs. CR1 has only two contact sets: CR1A is the FORWARD seal-in, so CR1B (N.C.) must provide both the FORWARD→REVERSE interlock and half of the "motor stopped" signal. The trick is to put CR1B at the very beginning of the REVERSE rung, just after N2. The node after it (N6) means "STOP not pressed and FORWARD not running." Both the REVERSE rung and the TR1 timer are fed from N6.

The lamps G1 and R1 are wired in parallel with the CR1 and CR2 coils, as in Lab 06, because CR1 has no spare contact.

Timer setting: TR1 = 5 s (on-delay). Real coast-down times depend on the machine: from a few seconds for a small fan to several minutes for a large centrifuge.

Timing Diagram

PB1 (FWD) PB3 (REV) PB2 (STOP) CR1 and G1 (FWD) CR2 and R1 (REV) TR1 coil (stopped) TR1A / TR1B (ready) power FWD STOP ready REV 5 s 5 s lockout
  • Power-up: TR1 starts timing. No start is possible for the first 5 s.
  • FWD: CR1 seals in. TR1 resets. The first REV press is ignored (interlock and permissive).
  • STOP: CR1 drops. TR1 starts timing the coast-down. A REV press during the lockout is ignored.
  • ready → REV: after 5 s, TR1's contacts close, and the next REV press starts CR2.

Functional Requirements

  1. PB1 starts FORWARD (CR1, G1); PB3 starts REVERSE (CR2, R1). Each seals in.
  2. FORWARD and REVERSE are interlocked: they can never be ON together.
  3. PB2 stops either direction.
  4. After any stop, and after power-up, neither START button works until the motor has been stopped for 5 s.
  5. After a power outage, nothing restarts by itself.

Ladder Diagram — Step-by-Step Drawing Guide

Draw on the Ladder Diagram Worksheet. Use pencil. This design uses 7 grid lines.

Step 1 — Rung 1: FORWARD
  1. From L1: PB2 (N.C.) → N2 → TR1A N.O.T.C. (1–3) → N3 → PB1 (N.O.) → N4 → CR2B N.C. (10–2) → N5 → CR1 coil (2–7).
Step 2 — Rung 2: FORWARD seal-in
  1. Draw CR1A N.O. (1–3) from N2 to N4, bypassing both TR1A and PB1.

Check: The seal-in must bypass TR1A: when FORWARD starts, TR1 resets and TR1A opens. CR2B stays after the seal-in junction as a running interlock.

Step 3 — Rung 3: FORWARD lamp
  1. From N5, draw G1 to L2 (in parallel with the CR1 coil).
Step 4 — Rung 4: REVERSE
  1. From N2: CR1B N.C. (8–5) → N6 → TR1B N.O.T.C. (8–6) → N7 → PB3 (N.O.) → N8 → CR2 coil (14–13).

Check: CR1B is the first device in this rung, ahead of the seal-in junction. When FORWARD runs, it removes power from everything after N6: the REVERSE start path, the REVERSE seal-in, and the timer (Rung 7).

Step 5 — Rung 5: REVERSE seal-in
  1. Draw CR2A N.O. (9–5) from N6 to N8, bypassing TR1B and PB3 (but not CR1B).
Step 6 — Rung 6: REVERSE lamp
  1. From N8, draw R1 to L2.
Step 7 — Rung 7: stopped-time timer
  1. From N6: CR2D N.C. (12–4) → N9 → TR1 coil (2–7).

Check: The TR1 coil path passes through PB2, CR1B, and CR2D: the timer runs only while STOP is released and both directions are OFF.

Step 8 — Trace your drawing with a pencil
  1. Power has just been turned ON (t = 1 s). Is the TR1 coil energized? Can PB1 start FORWARD? Why not?
  2. FORWARD is running. Trace why PB3 cannot start REVERSE. How many different contacts block it?
  3. FORWARD is running. What keeps CR1 energized, given that TR1A is now open?
  4. STOP was pressed 2 s ago. Which contact blocks PB1? Which blocks PB3?
  5. What would happen if the FORWARD seal-in were drawn from N3 to N4 (bypassing only PB1)?
Step 9 — Fill in the contact allocation table
DevicePartPinsUsed in Rung#
CR1 Coil 2–7  
CR1 CR1A N.O. 1–3  
CR1 CR1B N.C. 8–5  
CR2 Coil 14–13  
CR2 CR2A N.O. 9–5  
CR2 CR2B N.C. 10–2  
CR2 CR2D N.C. 12–4  
TR1 Coil 2–7  
TR1 TR1A N.O.T.C. 1–3  
TR1 TR1B N.O.T.C. 8–6  

From Ladder Diagram to Wiring Table

List every terminal on each node (with device names), chain them, and fill in the wiring table on the worksheet. The N6 row is done for you.

NodeTerminals on this nodeNumber of terminals
L1    
N2    
N3    
N4    
N5    
N6 CR1:5, TR1:8, CR2:9, CR2:12 4
N7    
N8    
N9    
L2    

Hint: Three devices here share pin numbers 1-3-4 and 8-6-5: CR1, TR1, and (for CR2) 9-5-1 / 10-6-2 / 12-8-4. Write the device name on every terminal.

Check: For this lab, you should have 22 wires in total.

Get instructor approval before wiring.

Key Wiring Points

  1. "Stopped" = CR1 N.C. AND CR2 N.C., in series, feeding the on-delay timer.
  2. The timer contacts are start permissives: in series with the START buttons, bypassed by the seal-ins.
  3. Interlocks must also act on a running motor: CR2B is after the FORWARD seal-in junction; CR1B is ahead of the whole REVERSE rung.
  4. CR1B does two jobs because of where it sits. A contact's position in the rung decides what it controls.
  5. The lockout also works at power-up, protecting a motor that may still be coasting after a short outage.

Wiring Procedure

  1. Power OFF. Set TR1 to 5 s.
  2. Wire the circuit from your approved wiring table, one node at a time.
  3. Meter check, power still OFF:

    Reading the meter: once the circuit is wired, the meter can find a path through coils and lamps. A reading of tens to thousands of ohms is normal and counts as high. Only a reading near 0 Ω means a direct connection.

    • L1 to TR1:1 should read near 0 Ω, and high while PB2 is pressed (TR1:1 is on N2).
    • TR1:1 to CR1:5 should read near 0 Ω (N2 → CR1B N.C. → N6).
    • CR2:12 to TR1:2 should read near 0 Ω (CR2D N.C. closed).
    • TR1:1 to PB1:1 should read high (TR1A open with the timer OFF).
    • CR2:10 to CR1:2 should read near 0 Ω (CR2B N.C. closed).
  4. Ask your lab partner to do a buddy check, then show the instructor.
  5. Power ON and complete the test table below.

Test & Acceptance

#TestExpected result✓
1 Power ON and immediately press PB1 Nothing happens (power-up lockout) ☐
2 Wait 6 s, then press PB1 FORWARD: CR1 ON, G1 ON ☐
3 Press PB3 while FORWARD runs No change ☐
4 Press PB2, then press PB3 within 2 s Motor stops; REVERSE does not start ☐
5 Keep pressing PB3 every second and time it REVERSE starts about 5 s after STOP. Measured: ______ s ☐
6 Press PB2, then press PB1 within 2 s FORWARD does not start (lockout applies to both directions) ☐
7 Wait 6 s, press PB1 FORWARD starts ☐
8 Throughout all tests G1 and R1 are never ON together ☐

Troubleshooting

SymptomWhat to check
Neither direction ever starts TR1 never times out: check CR1B (8–5), CR2D (12–4), TR1 coil on N9 and L2
Motor starts, but drops out as soon as the button is released Seal-in does not bypass the TR1 contact: FORWARD seal must be N2–N4; REVERSE seal N6–N8
Motor can reverse immediately after STOP TR1 contacts wired on N.C. pins (1–4 or 8–5), or bypassed
REVERSE can start while FORWARD runs CR1B not at the head of the REVERSE rung
FORWARD and REVERSE chatter A relay's own N.C. contact is in its own rung (check CR1B vs. CR2B)

Review Questions

  1. What is "plugging," and why is it harmful to a heavy conveyor drive?
  2. Why is the anti-plugging timer an on-delay timer fed by "motor stopped," rather than an off-delay timer?
  3. Explain why the FORWARD seal-in must go from N2 to N4 and not from N3 to N4.
  4. Explain how CR1B acts as both an interlock and part of the "stopped" signal. What would change if CR1B were placed just before the CR2 coil instead?
  5. A real system might use a zero-speed switch on the conveyor pulley instead of a fixed time. What advantage does that have?

Applying This Circuit Pattern

The "condition true for a time" permissive pattern: feed an on-delay timer through the condition, and put its contact in series with the START button(s), bypassed by the seal-in.

ApplicationConditionPermissive
Reversing drives (conveyors, hoists, winders) Motor stopped Allow reverse after coast-down
Large motor restart limiting Motor stopped Allow restart only after the windings cool (limits starts per hour)
Air conditioning compressor Compressor stopped Short-cycle protection: wait before restart
Pump after a power outage Power restored Staggered or delayed restart
Centrifuge or large fan Motor stopped Allow the lid or access door to open after the rotor stops

Design question for the future: Some processes allow restarting in the same direction immediately (the motor is already turning the right way) but still require the delay before reversing. How could you change this lab so that only the opposite direction is locked out?

Extension

Add a READY indicator that lights when a start is allowed. TR1 has no free contacts. Can you build READY with lamp G2 anyway? Hint: look for a node in your diagram that is live only when a start is allowed. Connect G2:2 to L2.


© 2026 Air Supply Information Center (Air Supply BBS)