Lab 07: Conveyor Sequence Interlock
Application Scenario
In a recycling plant, a short feed conveyor (Conveyor 1) drops material onto a long discharge conveyor (Conveyor 2), which carries it to a sorting station. The two conveyors must follow three rules:
- Start downstream first. Conveyor 1 may start only when Conveyor 2 is already running. Otherwise material piles up where the two conveyors meet.
- Stop upstream first. The operator stops Conveyor 1 and lets Conveyor 2 carry away the remaining material.
- Cascade stop. If Conveyor 2 stops for any reason (its STOP button, an overload trip, a pull-cord), Conveyor 1 must stop automatically.
This is called sequence interlocking. It is used on almost every multi-conveyor system: mines, quarries, airports, grain elevators, and distribution centers.
Each conveyor has its own push-button station:
| Conveyor | Relay (motor contactor) | START | STOP | Running lamp |
|---|---|---|---|---|
| Conveyor 2 (discharge, downstream) | CR2 | PB3 | PB4 | G1 |
| Conveyor 1 (feed, upstream) | CR1 | PB1 | PB2 | R1 |
Note: The trainer has only two lamps, so in this lab the lamp colors identify the conveyor, not a status. On a real panel, each conveyor would have its own green RUN pilot light.
Learning Outcomes
After this lab you will be able to:
- Use an N.O. contact of one motor's relay as a permissive for another motor.
- Explain the difference between a start permissive and a running interlock, and place each one correctly.
- Build a cascade stop so that a downstream failure automatically stops upstream equipment.
- Wire two independent start/stop stations, one for each motor.
Required Components
| Device | Type | Role in this lab |
|---|---|---|
| PB1 | Push button, N.O. | Conveyor 1 START |
| PB2 | Push button, N.C. | Conveyor 1 STOP |
| PB3 | Push button, N.O. | Conveyor 2 START |
| PB4 | Push button, N.C. | Conveyor 2 STOP |
| CR1 | Control relay (2 contact sets) | Conveyor 1 motor contactor (simulated) |
| CR2 | Control relay (4 contact sets) | Conveyor 2 motor contactor (simulated) |
| G1 | Green lamp | Conveyor 2 RUNNING |
| R1 | Red lamp | Conveyor 1 RUNNING |
Background
A relay contact as a permission. In Labs 04–06, the contacts that controlled a coil came from buttons or from the relay itself. In this lab, a contact from another motor's relay controls the coil. An N.O. contact of CR2 placed in the CR1 rung means: "Conveyor 1 is allowed to run only while Conveyor 2 is running."
Where the permissive contact goes makes all the difference. A seal-in contact bypasses everything it is connected across. So:
- If the CR2 contact is placed before the seal-in junction (in series with PB1 only), it is only a start permissive. It is checked when PB1 is pressed, then bypassed by the seal-in. If Conveyor 2 stops later, Conveyor 1 keeps running.
- If the CR2 contact is placed after the seal-in junction (in series with the CR1 coil), it is a running interlock. It is checked at start and all the time while running. If Conveyor 2 stops, Conveyor 1 stops too.
For a conveyor line, the cascade-stop rule requires a running interlock.
CR2 pins used in this lab:
| CR2 part | Common | N.O. | N.C. |
|---|---|---|---|
| CR2A | 9 | 5 | 1 |
| CR2B | 10 | 6 | 2 |
| CR2C | 11 | 7 | 3 |
| Coil | 14–13 (pin 13 to L2) |
Functional Requirements
- Pressing PB3 starts Conveyor 2 (CR2). It keeps running after PB3 is released. Pressing PB4 stops it.
- Pressing PB1 starts Conveyor 1 (CR1) only if Conveyor 2 is running. It keeps running after PB1 is released.
- Pressing PB2 stops Conveyor 1 only. Conveyor 2 keeps running.
- If Conveyor 2 stops for any reason, Conveyor 1 stops automatically.
- When Conveyor 2 is restarted, Conveyor 1 does not restart by itself.
- G1 is ON while Conveyor 2 runs. R1 is ON while Conveyor 1 runs.
- After a power outage, neither conveyor restarts by itself.
Ladder Diagram — Step-by-Step Drawing Guide
Draw on the Ladder Diagram Worksheet. L1 (+24 V) is the left rail and L2 (GND) is the right rail. Use pencil. This design uses 6 grid lines. Draw the downstream conveyor first, because it is the one that starts first.
Step 1 — Rung 1 (grid line 1): Conveyor 2 (downstream)
- Starting from L1, draw PB4 (N.C.), the Conveyor 2 STOP button. Label pins 1 and 2.
- To the right of PB4, draw PB3 (N.O.), the Conveyor 2 START button. Label pins 1 and 2.
- At the right end, draw the CR2 coil. Label pins 14 and 13. Connect pin 13 to L2.
- Mark the nodes: between PB4 and PB3 is N2; between PB3 and the CR2 coil is N3.
Step 2 — Rung 2 (grid line 2): Conveyor 2 seal-in
- On grid line 2, under PB3, draw a CR2A N.O. contact. Label pins 9 and 5.
- Connect pin 9 up to N2 and pin 5 up to N3.
Check: Rungs 1 and 2 are an ordinary three-wire start/stop circuit, like Lab 02, but using CR2.
Step 3 — Rung 3 (grid line 3): Conveyor 1 (upstream)
- Starting from L1, draw PB2 (N.C.), the Conveyor 1 STOP button. Label pins 1 and 2.
- To the right of PB2, draw PB1 (N.O.), the Conveyor 1 START button. Label pins 1 and 2.
- To the right of PB1, draw a CR2B N.O. contact. Label pin 10 on the left and pin 6 on the right. This is the running interlock: "Conveyor 2 is running."
- At the right end, draw the CR1 coil. Label pins 2 and 7. Connect pin 7 to L2.
- Mark the nodes: between PB2 and PB1 is N4; between PB1 and CR2B is N5; between CR2B and the CR1 coil is N6.
Check: This rung starts at L1 with its own STOP button, PB2. Pressing PB2 stops Conveyor 1 only. Conveyor 2 is not affected.
Step 4 — Rung 4 (grid line 4): Conveyor 1 seal-in
- On grid line 4, under PB1, draw a CR1A N.O. contact. Label pins 1 and 3.
- Connect pin 1 up to N4 and pin 3 up to N5.
Check: The seal-in goes around PB1 only (N4 to N5). CR2B stays after the seal-in junction, in series with the CR1 coil, so it can drop Conveyor 1 at any time. This is what makes it a running interlock.
Step 5 — Rung 5 (grid line 5): Conveyor 2 RUNNING lamp
- Starting from L1, draw a CR2C N.O. contact. Label pins 11 and 7.
- Draw G1 at the right end and connect it to L2. Mark the node between them as N7.
Step 6 — Rung 6 (grid line 6): Conveyor 1 RUNNING lamp
- Starting from L1, draw a CR1B N.O. contact. Label pins 8 and 6.
- Draw R1 at the right end and connect it to L2. Mark the node between them as N8.
Check: Both lamps are driven through relay contacts, not in parallel with the coils. In Lab 06, CR1 had no spare contact; here CR1B is free.
Step 7 — Trace your drawing with a pencil
- Both conveyors are OFF, and PB1 is pressed. Is there a path to the CR1 coil? Which contact blocks it?
- Conveyor 2 is running, and PB1 is pressed and released. Trace the path that keeps CR1 energized.
- Both conveyors are running, and PB2 is pressed. Which coil loses power? Which one keeps power?
- Both conveyors are running, and PB4 is pressed. Trace what happens to CR2, then to CR2B, then to CR1.
- Suppose CR2B were drawn between PB2 and PB1 instead (between N4 and PB1:1). Repeat question 4. What is different?
If any answer is wrong, fix the drawing before you continue.
Step 8 — Fill in the contact allocation table
| Relay | Part | Pins | Used in Rung# |
|---|---|---|---|
| CR2 | Coil | 14–13 | |
| CR2 | CR2A N.O. | 9–5 | |
| CR2 | CR2B N.O. | 10–6 | |
| CR2 | CR2C N.O. | 11–7 | |
| CR1 | Coil | 2–7 | |
| CR1 | CR1A N.O. | 1–3 | |
| CR1 | CR1B N.O. | 8–6 |
From Ladder Diagram to Wiring Table
Step 1 — List every terminal on each node
Look at each node dot on your drawing and write down every terminal that touches it. The N5 row is done for you.
| Node | Terminals on this node | Number of terminals |
|---|---|---|
| L1 | ||
| N2 | ||
| N3 | ||
| N4 | ||
| N5 | PB1:2, CR1:3, CR2:10 | 3 |
| N6 | ||
| N7 | ||
| N8 | ||
| L2 |
Hint: In this lab, L1 feeds four rungs directly (Rungs 1, 3, 5, and 6), so the L1 node has five terminals. Chain them just like any other node.
Step 2 — Chain the terminals of each node together
A node with k terminals needs k − 1 wires, connected in a chain. Keep no more than two wires under any terminal screw. Spread the GND return wires across the panel's L2 terminals.
Step 3 — Fill in the wiring table on the worksheet
Write one row per wire: Rung#, Wire#, From, To, and Purpose. In the Purpose column, include the node number in parentheses, for example: C2 STOP to C2 START (N2).
Check: For this lab, you should have 19 wires in total. If you have more or fewer, recheck your node table.
Step 4 — Get instructor approval
Show your ladder diagram, contact allocation table, node table, and wiring table to the instructor. Do not start wiring until the worksheet is stamped.
Key Wiring Points
- Downstream first. Draw and wire the downstream conveyor (Conveyor 2) first. The upstream conveyor depends on it.
- The permissive is an N.O. contact of the downstream relay (CR2B, 10–6), placed in the upstream rung.
- Running interlock goes after the seal-in junction. CR2B must be between N5 and the CR1 coil. Before the junction, it would be only a start permissive, and the cascade stop would not work.
- Each conveyor has its own STOP. PB2 stops Conveyor 1 only. PB4 stops Conveyor 2 directly and Conveyor 1 through the interlock.
- Use spare contacts for lamps. Driving a lamp through an N.O. contact proves the relay actually moved.
Wiring Procedure
- Power OFF the trainer (or unplug the power cord).
- Wire the circuit from your approved wiring table, one node at a time. Mark each wire as you install it.
- Meter check, power still OFF:
Reading the meter: once the circuit is wired, the meter can find a path through coils and lamps. A reading of tens to thousands of ohms is normal and counts as high. Only a reading near 0 Ω means a direct connection.
- L1 to CR2:9 should read near 0 Ω, and high while PB4 is pressed.
- CR2:9 to CR2:14 should read high, and near 0 Ω while PB3 is pressed.
- L1 to CR1:1 should read near 0 Ω, and high while PB2 is pressed.
- CR1:1 to CR2:10 should read high, and near 0 Ω while PB1 is pressed.
- CR2:10 to CR1:2 should read high (CR2B is N.O. and CR2 is OFF). A reading near 0 Ω means CR2B is on the N.C. pin.
- Ask your lab partner to do a buddy check, then show the instructor.
- Power ON and complete the test table below.
Test & Acceptance
| # | Test | Expected result | ✓ |
|---|---|---|---|
| 1 | Power ON, do nothing | Both relays OFF; G1 and R1 OFF | ☐ |
| 2 | Press and release PB1 (Conveyor 1 START) | Nothing happens (Conveyor 2 is not running) | ☐ |
| 3 | Press and release PB3 (Conveyor 2 START) | CR2 ON; G1 ON and stays ON | ☐ |
| 4 | Press and release PB1 | CR1 ON; R1 ON and stays ON | ☐ |
| 5 | Press PB2 (Conveyor 1 STOP) | CR1 OFF, R1 OFF; Conveyor 2 keeps running (G1 ON) | ☐ |
| 6 | Press and release PB1 again | CR1 ON; R1 ON | ☐ |
| 7 | Press PB4 (Conveyor 2 STOP) | Both relays OFF; G1 and R1 OFF (cascade stop) | ☐ |
| 8 | Press and release PB3 | CR2 ON, G1 ON; Conveyor 1 stays OFF | ☐ |
| 9 | Press PB1, then switch power OFF and back ON | Both lamps OFF; nothing restarts | ☐ |
Troubleshooting
| Symptom | What to check |
|---|---|
| Conveyor 1 starts even when Conveyor 2 is OFF | Is CR2B on 10–6 (N.O.), not 10–2 (N.C.)? Is it in the CR1 rung at all? |
| Conveyor 1 never starts | Is CR2B connected between N5 (PB1:2) and the CR1 coil? Is CR2 actually ON? |
| Conveyor 1 keeps running after PB4 stops Conveyor 2 | CR2B is before the seal-in junction. CR1:3 must land on N5 together with CR2:10, and CR2:6 must go to the CR1 coil |
| PB2 also stops Conveyor 2 | The Conveyor 2 rung is fed through PB2. Rung 1 must start at L1 through PB4 only |
| Conveyor 2 does not stay ON | Check CR2A: pins 9 and 5, between N2 and N3 |
| Wrong lamp lights | G1 must be on CR2C (11–7); R1 on CR1B (8–6) |
Review Questions
- Why must the downstream conveyor start first and stop last? What would happen at the transfer point if the order were reversed?
- CR2B is placed between N5 and the CR1 coil. What would change if it were placed between PB2 and PB1 instead? Which of the three rules would be broken?
- Both conveyors are running, and the Conveyor 2 motor overload relay trips. What happens to Conveyor 1? Why is this important for safety and for cleanup?
- After Conveyor 2 is restarted, Conveyor 1 does not restart by itself. Is this a good or a bad feature? Explain.
- A plant has four conveyors in a line: C1 → C2 → C3 → C4 (C4 is the last one). Describe where the interlock contacts go. How many relay contacts are needed just for the sequence interlocks?
Applying This Circuit Pattern
The running interlock pattern: a device may run only while another device is running. Place an N.O. contact of the "required" device's relay in series with the dependent device's coil, after its seal-in junction.
| Application | Must be running first | Dependent device |
|---|---|---|
| Conveyor lines, bucket elevators, crushers | Downstream conveyor | Upstream conveyor or feeder |
| Large motors, turbines, compressors | Lubrication oil pump | Main motor |
| Air compressor or chiller | Cooling water pump | Compressor |
| Paint spray booth, welding fume hood | Exhaust fan | Spray gun air valve, welding power |
| Wood shop, grinding station | Dust collector | Saw or grinder |
| Hydraulic press | Hydraulic pump | Press cycle |
Design question for the future: In a real plant, the lube oil pump must run for 30 seconds before the main motor is allowed to start, to build up oil pressure. Which part of this lab's circuit would change? What new device would you need? (You will learn this device in Part C.)
Extension: Start Permissive vs. Running Interlock
Power OFF. Rewire only Rungs 3 and 4 so that CR2B becomes a start permissive: PB2 → CR2B → PB1 → CR1 coil, with the CR1A seal-in connected from N4 (after PB2) directly to the CR1 coil. Remove all existing Rung 3 and Rung 4 wires except L1 → PB2:1 and CR1:7 → L2, then install:
| ☐ | From | To | Purpose |
|---|---|---|---|
| ☐ | PB2:2 | CR2:10 | STOP 1 to permissive CR2B (N4) |
| ☐ | CR2:10 | CR1:1 | N4 chained to seal-in common (N4) |
| ☐ | CR2:6 | PB1:1 | Permissive to START 1 |
| ☐ | PB1:2 | CR1:2 | START 1 to CR1 coil |
| ☐ | CR1:3 | CR1:2 | Seal-in to CR1 coil (bypasses CR2B and PB1) |
Power ON. Start Conveyor 2, then Conveyor 1. Now press PB4. What does Conveyor 1 do? Explain the result using the ladder diagram. When you are done, power OFF and restore the original wiring.